Begin with the reason
A migration needs a purpose beyond moving servers. Perhaps a team needs a more repeatable release process, better recovery options, or a simpler way to provision environments. State the intended change in terms the business can assess.
Make dependencies visible
An application rarely operates alone. Identify the data, integrations, identity systems, and operational routines around it. A useful map includes people and ownership as well as technical connections.
Compare more than infrastructure cost
Consider the work of running the system, the effort of migration, and the capabilities your team will need afterward. A decision that looks attractive in a narrow cost comparison can look different when the operating model is included.
Sequence around learning
Choose an initial workload that teaches you something useful without concentrating unnecessary risk. Define the conditions for moving forward and a practical recovery path if the assumptions prove wrong.
Treat operations as part of the design
Decide who responds to an alert, how changes are reviewed, and how recovery is rehearsed. Infrastructure choices and operational ownership belong in the same plan. A successful transition leaves the team able to run what it has built.
Better technology starts with a better understanding of the problem.